En
  • 50000+ Unit
    Total equipment
  • 2000+
    Cooperative Partner
  • 50000+
    Production area
Reaction kettle
Corrosion-resistant container
Metallurgical resource recycling system
Extraction equipment
Exhaust gas treatment equipment

Project Case

Rare precious metal hydrometallurgical extraction system

Location: Jinchang City, Gansu Province

Project Case

A project with an annual output of 12,000 tons of ternary materials

Location: Xinxiang City, Henan Province

Project Case

6000T/year - 3NCM product production line project

Location: Xinxiang City, Henan Province

Project Case

Project of Preparing Precursor Raw Materials for Tesla Batteries by Recycling Nickel-Cobalt Containing Materials

Location: Xinxiang City, Henan Province

Project Case

Chlorine-containing waste gas treatment project for nickel electrolysis workshop 2

Location: Jinchang City, Gansu Province

  • Extraction equipment

    Rare precious metal hydrometallurgical extraction system

  • Reaction kettle

    A project with an annual output of 12,000 tons of ternary materials

  • anti-corrosion container

    6000T/year - 3NCM product production line project

  • Metallurgical resource recycling system

    Project of Preparing Precursor Raw Materials for Tesla Batteries by Recycling Nickel-Cobalt Containing Materials

  • Exhaust gas treatment equipment

    Chlorine-containing waste gas treatment project for nickel electrolysis workshop 2

/
0571-82201600
18967196058
hzzh.1992@163.com
Puyang Town, Xiaoshan District, Hangzhou City, Zhejiang Province